Iniciativas que apoyamos Fundación ACCIONA.org Innovación Ofertas de empleo Seguridad y salud Diversidad, equidad e inclusión Becas y graduados Eólica Fotovoltaica Termosolar Biomasa Hidroeléctrica Eólica marina Almacenamiento Suministro de energía renovable Hidrógeno verde Eficiencia energética Movilidad eléctrica Autoconsumo Informe anual integrado Cuentas anuales Informes de resultados y presentaciones Periodo medio de pago a proveedores Rating Precio de la acción Dividendos Recomendación de analistas Agenda del inversor Financiación sostenible Junta General de Accionistas Consejo de Administración y Comisiones Equipo de Dirección Información accionarial Informe Anual de Gobierno Corporativo Remuneración de los Consejeros Normas de gobierno Ética y Cumplimiento Emisiones de deuda Comunicados a la CNMV Acuerdo marco de relaciones

The project for the New T1 Terminal at Barcelona Airport was carried out by a multidisciplinary technical team consisting of the Bofill Architecture Studio and ACCIONA Ingeniería, as part of the services provided under the Barcelona Plan of AENA (Spanish Airports Authority).

The main hall, under the roof in the form of a wing, receives a lot of natural light through linear skylights; the main dock (700 meters long) and two lateral docks evoke the shape of a sword; finally, the intermodal station provides a direct underground connection between Terminal 1 and the Metro network, the High Speed Train and the suburban train network of Barcelona. Around 15,000 employees work in Terminal 1 and the throughput of passengers is up to 100,000 a day.

The basic project and the construction project for the new Satellite Terminal at Barcelona Airport were also designed by the multidisciplinary team consisting of the Bofill Architecture Studio and ACCIONA Ingeniería. The Satellite is located opposite Terminal between the two existing runways parallel to the sea. It has an aerodynamic design that simultaneously evokes the shape of a bird and a plane.

Around 15,000 employees work in Terminal 1 and the throughput of passengers is up to 100,000 a day.