Initiatives we support ACCIONA.org foundation Innovation Job offers Safety and health Graduates and Internships Opportunities and inclusion Wind power Photovoltaic Thermal Solar CSP Biomass Hydroelectric Offshore wind Storage Renewable energy supply Green hydrogen Energy efficiency Electric mobility Self consumption Annual report Annual accounts Results, reports and presentations Average period of payment to suppliers Rating Share price Dividends Analysts’ recommendations Investor calendar Sustainable finance General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Rules of Governance Ethics and Compliance Fixed income CNMV communications Framework agreement

They are two twin wind farms featuring 21 wind turbines in total able to produce enough clean energy from wind to power more than 80,000 homes, thus avoiding the emission of 154,000 metric tons of CO2 a year.

Krobia I and Poniec II wind farms are two twin wind farms featuring 21 wind turbines in total able to produce enough clean energy from wind to power more than 80,000 homes, thus avoiding the emission of 154,000 metric tons of CO2 a year.

Each of the ACCIONA Windpower technology wind turbines has 3MW rated capacity and 116m rotor diameter mounted on 120-meter-high concrete tower. Owned, built and operated by ACCIONA Energy, both wind farms make 63 MW of installed capacity.

 

GENERAL INFORMATION

  • Location: Krobia and Poniec, Greater Poland. Poland.
  • Capacity: 33 MW (Krobia I), 30 MW (Poniec II).
  • Wind turbine: ACCIONA Windpower AW116/3000.
  • Tower: Concrete, hub-height 120m.
  • Start-up: 2013/2015.
  • Owner: ACCIONA Energy International.

KEY FIGURES

  • Average annual production: 160 GWh, equivalent to the consumption of around 80,000 homes
  • 154,000 metric tons of CO2 emissions to the atmosphere from coal-fired power stations avoided
  • Concrete tower with assembled sections manufactured close to the site
  • Foundations for, and installation of, 21 wind turbines
  • 110/30/12 kV substation
  • Project based on detailed technical studies to minimize its impact on the environment
  • Successfully built overcoming harsh winter weather conditions.
  • Installation took place during harsh winter weather conditions