Iniciativas que apoyamos Fundación ACCIONA.org Innovación Ofertas de empleo Seguridad y salud Becas y graduados Oportunidades e inclusión Eólica Fotovoltaica Termosolar Biomasa Hidroeléctrica Eólica marina Almacenamiento Suministro de energía renovable Hidrógeno verde Eficiencia energética Movilidad eléctrica Autoconsumo Informe anual integrado Cuentas anuales Informes de resultados y presentaciones Periodo medio de pago a proveedores Rating Precio de la acción Dividendos Recomendación de analistas Agenda del inversor Financiación sostenible Junta General de Accionistas Consejo de Administración y Comisiones Equipo de Dirección Información accionarial Informe Anual de Gobierno Corporativo Remuneración de los Consejeros Normas de gobierno Ética y Cumplimiento Emisiones de deuda Comunicados a la CNMV Acuerdo marco de relaciones

Up to 884MW of wind

Located within the South-West Renewable Energy Zone (REZ) in NSW, the Keri Keri Wind Farm is a proposed project of up to 884MW of wind energy with potential 200MW/800MWh battery storage. The project is within the Murray River Shire LGA and sits across 18,000 hectares of pastoral land.

 

The proposed Keri Keri Renewable Energy Project is located due south of the Willowvale Rest Area, abutting the Sturt Highway and Keri Keri Road. The planned Project EnergyConnect NSW/SA Interconnector is proposed to cross the southern portion of the 18,000ha site.

 

The wind farm represents an investment of up to $2.8 billion.

GENERAL INFORMATION

  • Project Configuration: up to 155 wind turbine generators based on 5.7MW machines
  • Location: Murray River Shire, NSW. The project is approximately 80km west of Hay
  • Capacity: up to to 884MW, with potential 200MW/800MWh battery storage
  • Construction Commencement: anticipated in 2027
  • Project Value: up to $2.8 billion investment

KEY FEATURES

The land is situated in a remote area characterised by very large pastoral landholdings. The proposed project site is very flat, with good access to transport infrastructure. The project boundary encompasses more than 18,000 ha of land, which is currently predominately used for merino sheep farming.

 

COMMUNITY BENEFITS

The Keri Keri Wind Farm will bring significant economic activity with a positive effect on the Murray River Council area

  • Up to 650 jobs during construction and up to 12 full-time roles once the wind farm becomes operational
  • Providing a diversified income for wind farm host landowners
  • Employment and procurement opportunities for local residents and businesses
  • Establishment of a community benefits program which will assist community organisations, community groups and local schools with financial grants to support community events, projects and activities
  • A Scholarship Program open to local students to provide support to further their education at University or TAFE