Iniciativas que apoyamos Fundación ACCIONA.org Innovación Ofertas de empleo Seguridad y salud Becas y graduados Oportunidades e inclusión Eólica Fotovoltaica Termosolar Biomasa Hidroeléctrica Eólica marina Almacenamiento Suministro de energía renovable Hidrógeno verde Eficiencia energética Movilidad eléctrica Autoconsumo Informe anual integrado Cuentas anuales Informes de resultados y presentaciones Periodo medio de pago a proveedores Rating Precio de la acción Dividendos Recomendación de analistas Agenda del inversor Financiación sostenible Junta General de Accionistas Consejo de Administración y Comisiones Equipo de Dirección Información accionarial Informe Anual de Gobierno Corporativo Remuneración de los Consejeros Normas de gobierno Ética y Cumplimiento Emisiones de deuda Comunicados a la CNMV Acuerdo marco de relaciones

Located in Almendralejo (Badajoz province) with a capacity of 125 MWp, the complex entered service in January 2023

The Extremadura I-II-III photovoltaic project consists of the installation of three latest-generation solar plants to transform the sun’s rays into clean energy equivalent to the consumption of 65,138 homes, without contributing to climate change and protecting the environment as much as possible.

Construction work on the future solar complex began in November 2021 and it entered service in January 2023. It consists of a total of 234,640 photovoltaic modules of 540 watts each in Extremadura I and 535 watts in Extremadura II and III which will produce around 257 GWh of clean electricity per year.

The construction of Extremadura I-II-III will give rise to property tax income that will have a knock-on effect in the form of benefits for the local community. ACCIONA Energía also undertakes to invest a percentage of the revenue earned in social projects; this will be decided after evaluating the needs of the area following consultation with local authorities.

The construction of the complex will mean around 393 jobs, with 5 permanent posts being created in the operational phase.

 

GENERAL INFORMATION

  • Location: Almendralejo (Badajoz)
  • Peak power: 125 MWp
  • Technology: photovoltaic solar on single-axis tracker
  • Entry into service: January 2023
  • Ownership: ACCIONA Energía

KEY FEATURES

  • Latest-generation infrastructure that promotes advanced activities in rural areas.
  • Average annual production estimated at 257 GWh, equivalent to the consumption of around 65,000 homes.
  • Around 112,000 tonnes of CO2 emissions to the atmosphere avoided every year.
  • Creation of around 400 new jobs (393 in the construction phase and 5 in operation).
  • Programme of investments in projects of a social nature in the area.
  • Preventive and corrective measures to minimize the environmental impact.