Initiatives we support ACCIONA.org foundation Innovation Job offers Safety and health Graduates and Internships Opportunities and inclusion Wind power Photovoltaic Thermal Solar CSP Biomass Hydroelectric Offshore wind Storage Renewable energy supply Green hydrogen Energy efficiency Electric mobility Self consumption Annual report Annual accounts Results, reports and presentations Average period of payment to suppliers Rating Share price Dividends Analysts’ recommendations Investor calendar Sustainable finance General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Rules of Governance Ethics and Compliance Fixed income CNMV communications Framework agreement

The 8.45 km Antequera - Peña de los Enamorados section runs entirely through Málaga province, passing through the municipalities of Antequera and Archidona. The route includes three viaducts, two underpasses, a cut-and-cover tunnel and an overpass support structure to cross over the existing railway line.

The beginning of the section is located to the northeast of Antequera, about 3 km from the town, where it connects with the project for the Bobadilla - Antequera junction section. After passing through the Vega de Antequera, it crosses the A-45 dual carriageway by means of a 130-metre-long viaduct known as the 'Viaduct over the A-45'.

Once past the junction with the A-45 dual carriageway, the route turns to the left and a second viaduct, the 'Viaduct over the River Guadalhorce and the A-92', with a span of 49 metres and a length of 2,525.50 metres, crosses the junction over the River Guadalhorce and the A-92 dual carriageway.

Once the crossing over the A-92 motorway has been passed, the route is situated to the north of the A-92 and continues through a 790-metre long artificial tunnel.

Subsequently, a new 606-metre viaduct is planned, called the 'Viaducto del Cortijo de Roperos', to cross a wide watercourse in which the number of spans has been reduced by two, and pile no. 7 is established as a fixed point.

The route then turns to the left and crosses the Fuente de Piedra - Granada railway line, a new viaduct, 123 metres long, called 'Viaduct over FC Fuente de Piedra - Granada'.

GENERAL INFORMATION

  • Location: Córdoba - Málaga, Spain.
  • Contract type: Construction.
  • Infrastructure: The Antequera - Peña de los Enamorados section runs entirely through Málaga province, with its 8.45 km crossing the municipalities of Antequera and Archidona. The route includes three viaducts, two underpasses, a cut-and-cover tunnel and an overpass support structure to cross over the existing railway line. Construction of the railway track infrastructure, including:
    1. Viaduct over the A-92 highway and the River Guadalhorce, 2,525 metres long (90 m span)
    2. Viaduct over the Cortijo Roperos, 606 metres long.
    3. Viaduct over the A-45 highway, 130 metres long.
    4. Overpass support structure over the Fuente de Piedra-Granada railway line, 60 metres long.
    5. Cut-and-cover tunnel, 790 metres long.
    6. 3 underpasses.
  • Project value: 150 million euros.
  • Year of project completion: 2018