Initiatives we support ACCIONA.org foundation Innovation Job offers Safety and health Graduates and Internships Opportunities and inclusion Wind power Photovoltaic Thermal Solar CSP Biomass Hydroelectric Offshore wind Storage Renewable energy supply Green hydrogen Energy efficiency Electric mobility Self consumption Annual report Annual accounts Results, reports and presentations Average period of payment to suppliers Rating Share price Dividends Analysts’ recommendations Investor calendar Sustainable finance General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Rules of Governance Ethics and Compliance Fixed income CNMV communications Framework agreement

When ACCIONA grid connected the Amareleja solar plant (Portugal) in 2008 it successfully overcame the challenge of installing the biggest photovoltaic plant to date, in a record 13 months. A clear demonstration of the company’s technological capacity.

ACCIONA was a pioneer when it built the 45.78 MWp Amareleja plant, one of the biggest in the world equipped with tracking throughout the solar field when it was installed.

It has 2,520 solar trackers (proprietary technology) that incorporate 262,080 photovoltaic modules. These produce around 93 GWh per year, equivalent to the demand from around 30,000 homes.

GENERAL INFORMATION

  • Location: Amareleja, Moura (Portugal).
  • Peak capacity: 45.78 MWp.
  • Technology: Photovoltaic solar with azimuthal tracking.
  • Start-up: 2008.
  • Owner: ACCIONA Energía.

KEY POINTS

  • Average annual production: 93 GWh.
  • Clean energy equivalent to the demand from 30,000 Portuguese homes.
  • 262,080 photovoltaic modules.
  • 2,520 azimuthal solar trackers covering 141 m2 (unit area).
  • 89,000 metric tons of CO2 avoided annually.
  • 250-hectare site.
  • Local development in an economically depressed area.
  • Construction in record time: 13 months.