We use proprietary and third-party cookies to improve our services and show you advertising related to your preferences through analysis of your browsing habits. If you continue browsing, we consider that you accept their use. You can get more information, and find out how to change your settings, in our Cookies Policy

What are you searching?

    Spain

    The main centers of ACCIONA Energy are located in Spain, together with a large part of its productive assets.

    The country was also the scene of its initial activities in renewable energy sources and has been a solid platform for the intense process of international expansion in which the company is still involved.

    Spain accounts for around 63 per cent of the renewable electricity generation assets of the group, but this percentage will continue to fall in the next few years. ACCIONA Energy owns assets in Spain in wind power (4,710 MW) hydroelectric power (876 MW), photovoltaic (3,20 MW) and biomass (61 MW).

    It has also installed 1,354 MW of wind power and 67 MWp of photovoltaic capacity for third parties.


    Projects

    168 WIND FARMS, 4,513 WIND TURBINES

    168 WIND FARMS, 4,513 WIND TURBINES

    ACCIONA Energy owns 168 wind farms in Spain, consisting of 4,513 wind turbines and overall capacity of 4,710 MW (3,470 MW consolidated). These assets are spread over ten regions: Galicia (993 MW), Valencia (939 MW), Navarra (825 MW), Castilla-La Mancha (557 MW), Castilla y León (520 MW), Andalusia (477 MW), Catalonia (252 MW), Asturias (89 MW), Aragon (49 MW) and the Basque Country (10 MW). It has also installed 38 wind farms for third-party customers (1,354 MW).

    76 HYDROELECTRIC PLANTS

    76 HYDROELECTRIC PLANTS

    All ACCIONA Energy’s hydroelectric assets are located in Spanish river basins. Specifically, there are 76 plants totaling 876 MW. Most are located (37) in Aragon and account for 704 MW. The rest stand on rivers in (89 MW), Cantabria (48 MW), Catalonia (41 MW), Castilla y León (4 MW) La Rioja and Valencia (1 MW in both cases). They produced around 2,000 GWh of clean electricity a year, equivalent to the average electricity consumption of 525,000 homes.

    3 BIOMASS PLANTS

    3 BIOMASS PLANTS

    Transforming agricultural or forestry waste into clean electricity. That is basically the activity carried out by the three biomass plants owned by ACCIONA Energía in Spain. The 30 MW plant at Sangüesa (Navarra), grid connected in 2002, was a pioneer in southern Europe and gave the company essential technological and logistical knowledge to later install plants at Briviesca (16 MW), in Burgos, and Miajadas (15 MW), in Cáceres. The last-named, grid connected in 2010, was the first in Spain to combine herbaceous and ligneous raw material. They cover the electricity demand of more than 130,000 homes.

     


    Contact

    ACCIONA ENERGÍA, S.A.


    +34 91 6576460
    Avda. Europa , 10. Parque Empresarial La Moraleja. 28108 Alcobendas (Madrid)

    ACCIONA ENERGÍA, S.A.


    +34 948 00 60 30
    Avda. Ciudad de la Innovación, 5.
    31621 Sarriguren (Navarra)


    Move up