We use proprietary and third-party cookies to improve our services and show you advertising related to your preferences through analysis of your browsing habits. If you continue browsing, we consider that you accept their use. You can get more information, and find out how to change your settings, in our Cookies Policy

What are you searching?

    Jelinak Wind Farm

    30MW wind farm, with 20 AW1500 wind turbines

    Located in the region of Split-Dalmatia, Jelinak was inaugurated on October 6th 2013 by Croatian President, Ivo Josipović. It consists of twenty AW1500 wind turbines of ACCIONA Windpower technology representing a total capacity of 30 MW, able to generate electricity equivalent to the consumption of around 30,000 Croatian homes per year. ACCIONA was the first Spanish wind power developer to open a wind farm in the country.

    GENERAL INFORMATION

    Location
    Seget and Marina, Dalmatia-Split, Croatia.
    Capacity
    30 MW.
    Wind turbine
    20 ACCIONA Windpower AW 82/1500.
    Tower
    Steel, 80-meter hub height.
    Start-up
    2013.
    Owners
    ACCIONA Energía

    Key Points

    • First ACCIONA’s wind farm in Croatia.
    • Estimated annual production: 81 GWh
    • Clean energy able to cover the demand of over 30,000 Croatian homes
    • Inaugurated by Croatian Republic President Ivo Josipović on October 6th, 2013.
    • 77,841 metric tons of CO2 from coal-fired power stations avoided per year.
    • Over 500 people worked on the activities related to the entry into service of the wind farm.
    • 80-m-high steel towers manufactured at the shipyards in Split..

    IMAGE GALLERY



    Move up