    The EPC contract includes the engineering, construction, supply of equipment, assembly and start-up of the hydroelectric plant and the associated substation and high-voltage line for their connection to the electrical grid.

    The engine room is equipped with 3 turbine-generator sets that process a total of 191.25 m3/s, generating a total power of 24.3 MW in the plant. The civil works have included highly complex excavations carried out next to the existing dam.

    GENERAL INFORMATION

    Project undertaken by ACCIONA's Infrastructure Division

    Location
    Nayarit, Mexico
    Client
    SGSR, Sociedad Generadora de San Rafael
    Capacity
    Three turbines of 9.69 MVA to 8.72 MW
    Contract type
    EPC - Engineering, Procurement, Construction, and Launch
    Year construction ended
    February 2016