Installations
Six plants in service (314 MW)

ACCIONA Energy now has six concentrating solar power (CSP) plants in operation. The first one, Nevada Solar One (Nevada, USA), with 64 MW, was followed by five other plants in Spain: Alvarado (Badajoz), Majadas (Cáceres), Palma del Río II and Palma del Río I (Córdoba) and Orellana (Badajoz), all of them with 50 MW.
The five plants located in Spain (total capacity 250 MW) were included in the Preliminary Allocation Register of the Ministry of Industry, Commerce and Tourism.
The company thus has currently an operational capacity of 314 MW.
| TOTAL (property + customers) |
Property | Attributable | |
|---|---|---|---|
| Spain | 250.00 | 250.00 | 250.00 |
| Other countries | 65.00 | 64.00 | 64.00 |
| TOTAL | 315.00 | 314.00 | 314.00 |